Customization: | Available |
---|---|
Condition: | New |
Certification: | ISO, CE |
Still deciding? Get samples of US$ 5/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model |
JC |
Rated Voltage |
6V/12V |
Strong charging pressure |
7.4/14.8V |
Equilibrium charging |
7.25/14.5V |
Float charging pressure |
6.85/13.7V |
Under voltage |
5.4V/10.8V |
Under recover voltage |
6.5/13V |
Non -load current |
≤6mA |
Charging circuit voltage drop |
≤0.2V |
Discharge circuit voltage drop |
≤0.1V |
Maximum charging current |
1A 3A 5A |
Maximum load current |
1A 3A 5A |
Controller protection |
overcharge, over-discharge, over-current, short-circuit, reversed |
Charging Mode |
PWM Charging Mode |
Using elevation |
≤5500m(more than 2000m should be used in lower power |
Working temperature |
-20ºC~55ºC |
Gross Weight (KG) |
0.05KG |
Net Weight (KG) |
0.035KG |
Size |
79.5mm*52mm*21.5mm |
Protection level |
IP22 |
1- Integrate household type and street lamp type design in one controller 2- Used for 6V/12V battery system 3- Light control + time control 4- Three charging mode, strong charging, equilibrium charging, floating three-step |
1- Dial switch,1, 2, 3, 4, as shown in the diagram means setting time,8,4 ,2 ,1
2- Setting 6hours, just need to dial up button 2 and 3,
operation like this, LED can light last 6 hours. 3- Setting 11hours, dial up button 8, 2, and 1, operation like this, LED will works 11 hours |
1- More than 10 years Professional Manufacturer. 2- Sample testing is available. 3- On-time shipment & 3 years warranty. Warmly Welcome To Visit Our Company !!! |